Re: 4 weeks later roof gutter
Re: 4 weeks later roof gutter
Re: 4 weeks later roof gutter
That is the front roof gutter done and yet another lot of leaves that won't be blocking the down pipes. There was one lump of roof cement down one of them big enough to not go down the Skyvac pipe which could have caused problems later on. Also a small bit of roof tile (small corner section) also picked up by the vacuum cleaner.
|