Finished at last
Those who have been following our progress after moving into this house will know what has been involved to get it back as it should be. It has taken 2 years almost, apart from my lengthy time in hospital and op recovery, to sort everything out.
We have now FINISHED Yippee.
for those who don't know here is a brief list of jobs done
New central heating boiler and radiators /heated towel rails
New main bathroom
Window handle gear boxes replaced
4 aerials off roof replaced with one and sat dish
2 log stores taken down and greenhouse in place of one
Conservatory replaced from dwarf wall up
2 new electric garage doors
new carpets throughout
every room redecorated
Large front brick drive cleaned and resanded
House gutters cleaned
Kitchen 5 ring oven professionally cleaned and extractor
new lounge lights and others replaced where needed
garage electrics sorted
lawn moss removed about 20 wheelie bins full
4 huge oak trees looked at and dead wood removed
replace back metal gate with solid wood one
The previous owners had it left to them by the old lady who owned it as they had moved in and looked after her. Consequently they had not made any effort to do any work on the place
Now
back with old conservatory and new green house
One site of old log store
behind paved over
One of old log stores I took down
other on side of house log store
removed
Garden stripped of moss