The kitchen saga begins
Our kitchen should have been installed before Easter, but obviously with the covid this had to be put off, the electrician came Monday to install the new cooker circuits, whilst he had the boards up in the hall, he noticed water under the floor, turns out our toilet had been leaking, possibly for three years when the bathroom was done, fortunately he knew a plumber who, as it turns out, lives locally, he came out yesterday and sized up what was required, he came back today and fitt3d a new flexible waste pipe, job done, unfortunately part of the bathroom wall ( plasterboard) was rotten , fortunately the plasterer comes on Saturday so all should be good, although atm, there’s no cupboards and a large hole through the wall into the bathroom, handy for passing toilet rolls through