Re: Back onto the Office
First two boards installed and socket reconnected, I left the cable tails long enough so when the Plasterer arrives, I will kill the power to that area and ease the sockets forward so he can get behind.
Cut out the socket on the third board, this just needs fitting tomorrow, the insulation and the ceiling boards have to go in next before the top wall boards, I will then Scrim the joints and fit the Beadings around the window and door apertures so all the Plasterer has to do is Plaster.